Rovex Construction

New · ROVEX POOL · Algarve

The pool that arrives finished. And doesn't look like a container.

ROVEX POOL is prefabricated from a new shipping container: smooth inner walls, reinforced liner, full-width steps and the plant room hidden under a stone hatch. In the garden it sits flush with the paving, finished with a limestone coping.

ROVEX POOL 12: pool with limestone coping in a garden
Design visualisations (illustrative images). House, garden, surrounding paving and furniture are not included.

Models

Two sizes. The same care.

Both 1.40 m deep, with full-width steps and bench, and the plant room at the end next to the house.

ROVEX POOL 6: pool with limestone coping in a garden

ROVEX POOL 6

20 ft container · for compact gardens

Water surface
4.80 × 2.34 m
Water depth
1.40 m
Water volume
≈ 13.4 m³
Size with coping
6.63 × 3.08 m
from €36,500 + VAT€44,895 incl. VAT (23%)

Indicative price without heat pump or anchor slab (options).

ROVEX POOL 12: pool with limestone coping in a garden

ROVEX POOL 12

40 ft container · for real swimming

Water surface
10.61 × 2.34 m
Water depth
1.40 m
Water volume
≈ 32.4 m³
Size with coping
12.77 × 3.08 m
from €55,500 + VAT€68,265 incl. VAT (23%)

Indicative price without heat pump or anchor slab (options).

Gallery

Design visualisations (illustrative images). House, garden, surrounding paving and furniture are not included.

How it works

Designed as a pool. Built as a module.

From outside you only see the stone coping and the hatch in the same paving. Everything else is hidden yet accessible.

Smooth wall, reinforced liner

A 3 mm steel sheet is welded over the corrugated container wall and stiffened outside. The 1.5 mm reinforced liner lies on a flat surface: no corrugation shows.

High water level, stone coping

The water sits 8 cm below the 40 cm limestone coping, which overhangs the water by 3 cm. The steel disappears under stone and a concrete collar.

Plant room under the hatch

Filter, variable-speed pump, controls and salt system sit in a watertight compartment under a two-leaf hatch finished in the same stone, with gas struts and a key lock.

No skimmer lids in the paving

The high-level skimmers sit in the plant-room wall. Baskets are emptied from inside: no round lids in the paving.

Safety

No main drain, 12 V LED lighting, 30 mA residual-current protection and a sump pump with alarm in the plant room.

Soft water, automatic top-up

Low-salt chlorinator (1.5–2 g/l) with pH control and automatic top-up with a free outlet above the water.

Dimensions

Plan, section and technical data.

Dimensions of the V01 standard design. Exact position, excavation and connections are set for each site.

PlanPlant room (stone hatch)Steps + benchSkimmer · LED4.80 m6.63 m2.34 m3.08 mLong sectionWater level −0.08 m1.40 mPlant room
PlanPlant room (stone hatch)Steps + benchSkimmer · LED10.61 m12.77 m2.34 m3.08 mLong sectionWater level −0.08 m1.40 mPlant room
ROVEX POOL 6ROVEX POOL 12
Water surface4.80 × 2.34 m10.61 × 2.34 m
Water depth1.40 m1.40 m
Water volume≈ 13.4 m³≈ 32.4 m³
Size with coping6.63 × 3.08 m12.77 × 3.08 m
Excavation approx.≈ 7.7 × 4.1 × 2.1 m≈ 13.8 × 4.1 × 2.1 m
Module in transport6.06 × 2.54 m, approx. 3.8 t12.19 × 2.54 m, approx. 6.0 t
Plant room (inside)1.00 × 2.35 m, height 1.37 m1.33 × 2.35 m, height 1.37 m
Skimmers / LED lights1 / 12 / 2
FiltrationVariable-speed pump 0.75 kW, filter Ø500 mm, turnover in 2.2 hVariable-speed pump 1.1 kW, filter Ø600 mm, turnover in 3.2 h
Water treatmentLow-salt chlorinator + pHLow-salt chlorinator + pH
Heating (option)Heat pump 7 kWHeat pump 13 kW

Price

What's included in the price.

ROVEX POOL 6

from €36,500 + VAT€44,895 incl. VAT (23%)

ROVEX POOL 12

from €55,500 + VAT€68,265 incl. VAT (23%)

Included in the indicative price

  • Prefabricated module: steel structure with smooth inner wall, XPS insulation, epoxy protection, reinforced liner, steps with bench, skimmers, LED lights and return inlets.
  • Plant room assembled and tested: variable-speed pump, filter, low-salt chlorinator with pH control, control panel, automatic top-up, sump pump with alarm and stone hatch with gas struts and lock.
  • Site works: excavation and removal of soil, perimeter drain, base, transport and crane placement, backfill, concrete collar and 40 cm limestone coping.
  • Electrical connection up to 15 m from the existing board with certification, commissioning, first salt fill and handover briefing.
  • Structural check with signed statement of responsibility (termo de responsabilidade).

Not included

  • Architectural design and municipal licensing, where required.
  • Paving beyond the coping, fencing, garden and furniture.
  • Rock, groundwater, difficult truck and crane access.
  • Electrical cable beyond 15 m and special water or drainage connections.

Indicative price for an Algarve site with truck and crane access, excavation in soil without rock and without groundwater down to the excavation level (about 2.1 m). The final price is confirmed in the quotation after a site visit.

Options

OptionROVEX POOL 6ROVEX POOL 12
Heat pump 7 / 13 kW, at least 3.5 m from the water€2,280€2,800 incl. VAT (23%)€3,320€4,080 incl. VAT (23%)
Anchor slab for sites with groundwater€2,170€2,670 incl. VAT (23%)€4,050€4,980 incl. VAT (23%)
Counter-current unit 2.2 kW€2,060€2,540 incl. VAT (23%)€2,060€2,540 incl. VAT (23%)
Cleaning robot€1,120€1,380 incl. VAT (23%)€1,120€1,380 incl. VAT (23%)
Made-to-measure safety cover€1,010€1,250 incl. VAT (23%)€1,750€2,150 incl. VAT (23%)
Stone paving around the pool€110 per m²€130 incl. VAT (23%)€110 per m²€130 incl. VAT (23%)
Outdoor shower with connection€810€1,000 incl. VAT (23%)€810€1,000 incl. VAT (23%)
Excavation in rock€70 per m³€90 incl. VAT (23%)€70 per m³€90 incl. VAT (23%)

Prices excl. VAT. Incl. VAT (23%) in small print.

Prefab pool guide →

Process

From first contact to first swim.

  1. Site visit

    We check the position, crane access, power supply and whether groundwater is likely.

  2. Fixed quotation

    Model, position, options and final price. We check with you what the municipality requires.

  3. Fabrication and testing

    The module is prepared in the workshop, with the plant room assembled and tested.

  4. Site preparation

    Excavation, perimeter drain and base.

  5. Placement

    Transport and crane; the module is levelled, backfilled and finished with collar and coping.

  6. Commissioning

    Filling, start-up of filtration and chlorinator, handover briefing.

FAQ

What people ask us.

Can you tell it is a container?

No. Inside, the wall is smooth and lined with a reinforced liner. Outside, the pool is sunk into the ground: you only see the stone coping and the plant-room hatch in the same paving.

Won't the steel rust?

The module is blast-cleaned and epoxy-coated inside and out. The water never touches the steel because the reinforced liner is watertight, and the low-salt chlorinator makes the water less aggressive should the liner be damaged.

What if the site has groundwater?

We check the water table during the visit. If water is close to the excavation level, the pool gets an anchor slab (option) and buoyancy is verified for that site.

Do I need a permit?

That depends on the municipality and the site. We check with you what the Câmara Municipal requires and, if needed, handle the process, quoted separately.

How long does it take?

It depends on fabrication and, where required, the permit. Placement on site is quick because the pool arrives finished. The timeline is stated in the quotation.

Can I heat the water?

Yes, with the optional heat pump (7 kW for POOL 6, 13 kW for POOL 12), placed at least 3.5 m from the pool.

Where do you install?

Throughout the Algarve. Other locations on request.

Request

Request your quotation.

Tell us the model and where the site is. We reply with the next steps and arrange a visit.

We respond quickly with an update.

ROVEX POOL 6: pool with LED lighting in the evening

Direct contact

Rovex Construction

Portimão, Algarve

Mon - Sat 08:00 - 20:00 Sunday closed

V01 standard design: preliminary design is complete. Structure, electrics and placement are checked and signed off by licensed professionals for each site.